10 Step by Step ERP Implementation Process

From being a mere enterprise management software program to being an integral part of an enterprise, the ERP solution has come a long way not solely in terms of smoothing the enterprise process but additionally with boosting the enterprise’ overall development. The complexities and a number of activities of companies, cutting throughout all country and time zone borders inflict unwarranted chaos. It is here where an effective ERP solution with its far-reaching impact irons out chaos right into a systemic design for a steady supply of constructive output for the corporate. It streamlines and accelerates the enterprise course of offering a competitive edge to the corporate. It is alleged, “the first right move leads to half of the war won”; thus, it is basic to have an accurate implementation of ERP for optimum utilization. Below we current the “10 Must-Follow Steps” for profitable implementation of the ERP solution.


1. Identify the issues / Set the target

ERP solutions give an enormous solution to many issues confronted by corporations. However, it is extremely essential to determine the true goal for implementing ERP. The query is much less about “ought to we implement” and however more about “what should ERP be implemented for”. The Key Performance Indicators (KPI) have to be analyzed in order to perceive the need for the software intervention. Key targets are needed; not solely with respect to the current but in addition, because future projections are included within the requisition checklist, which permits an enterprise to issue within the scalability and accommodate modifications in the way forward for the enterprise/business. So once more, it’s important to determine the issue or the precise necessity motivating the ERP.


2. Define scope/team

The targets might be many, starting from bringing within the transparency of operations to having monetary management, supporting natural growth, supporting acquisition or supporting widespread processes. As per Panorama research, 61.1% of ERP implementations take longer than anticipated and 74.1% of ERP projects exceed the budget. The major reason for the delays and overbudgeting is the unclear definition of the ERP requirement. The ERP features have to be evaluated in accordance with the barometer of synchronization throughout the needs of the firm. Depending upon the budget and core necessity, the ERP demand list ought to be generated which achieves an easy and hurdle much less ERP implementation.


3. Brainstorm/consider the choices

As per DJ Yap & Associates, roughly 33% of ERP consumers did not demo a product before buying it and roughly 22% of corporations surveyed reported they purchased the first system they checked out. These are harmful statistics, not solely for individuals who implement the ERP but in addition for the vendors, as optimum utilization of ERP software remains a dream. For successful utilization of ERP software programs, the administration of the corporate has to invest its time in evaluating the options obtainable. In the 2015 ERP report, it was discovered that 93% of the businesses customized their ERP software to some degree in accordance with their intended use. The customization might generally lead to a rise within the failure of the ERP system as it might improve the complexities. he group needs to perceive the distinction between ERP package configuration and customization clearly as a result of many occasions the requirement is fulfilled by the bought of the ERP system and no customization is required. Evaluating ERP choices is an important job, as choices are to be evaluated based on present wants, in addition to in opposition to future necessities.  New additions, like cloud ERP solutions or SaaS ERP, are the present desire of consumers, as these choices –can be found in numerous scope and flexibilities to accommodate future necessities. Thus, an organization needs to brainstorm with the ERP distributors/ consultants to bring in the perfect system within the group.


4. Data migration

Once an ERP solution is recognized, the following largest and most essential step is knowledge migration, which gives for an easy transition and future utilization of the software. Implementing an ERP generally is a large change, particularly if the corporate is attempting the software for the first time. Identifying which knowledge is needed for a successful transition to the widespread software drawback is essential. Most software permits the input of data however total data shifting might burden the ERP software. Therefore, only the required and most essential data must be transferred to the software, and nice care ought to be taken to make sure that the data is retrieved from the software, every time required.


5. Check infrastructure 

Preparing the corporate for the ERP implementation is at the core of all the steps of ERP implementation and performs a significant function within the process, be it successful or failure. After detailed brainstorming between the seller and its management, the requisite infrastructure is put in. According to Mint Jutras, 23% are unable to develop their enterprise as quickly as they want and imagine this to be because they lack the instruments they need of their present ERP system. The infrastructure on which the software program will run, has to have the scope of scalability together with choices to replace as per the demand.  Such requirements shouldn’t be restricted.


6. Customization

ERP software is designed after a major amount of analysis and in accordance to the needs of the specific industry.  In some instances, there could also be no need for customization. Implementing an ERP solution is a giant investment determination by the corporate involving a big pool of assets, due to this fact, the administration has to constantly keep tabs on the ERP software and upkeep schedule. During the pilot testing, the administration has to consider the conclusion of the worth of the system in opposition to the specified worth of the corporate. One should have a verify on the system adopted by the corporate since its inception –as long as the company is following greatest practices OR it un-follows some unconventional/previous strategies relating to the ERP being fit-as-it-is-bought? These questions ought to be answered prior to customization as there’s a probability that even before understanding the software, the system and making positive adjustments, and the necessity might never come up to customise the software.


7. Change management

Employees of any company are accustomed to the identical type of actions carried out by way of an outlined process of their every day routine and any adjustments will not be easily accepted, particularly when it’s something as influential as ERP and that’s when Change Management turns into essential. ERP isn’t a fixed asset like a pc that is bought and set up within the firm workplace; it is actually a system that might change the setting and the working style for the higher, which impacts not just one or two operations but all. Management ought to contain their staff and put together them mentally to answer vital questions like – Why is it essential for the organization to embody ERP? OR How would an ERP increase productiveness? OR How would an ERP automate back-office capabilities and save time?  A collection of brainstorming periods, updates on associated developments and resolving queries would build staff’ confidence and put together them to welcome the nice change with open arms. Change is for every one and speaking this positively to the staff will make issues simpler as an ERP can solely present optimum results when each worker accepts the change. Therefore, care has to be taken to guarantee an easy, but profitable transition by building employee consensus and confidence.


8. Technology & Knowledge Transfer

21% of ERP implementations fail to deliver vital enterprise benefits. The causes differ, beginning with improper customization for non-optimal software utilization ensuing from ill-trained personnel working/feeding data to the solution. Training is a crucial side of the ERP software implementation process.  It ensures there are fewer points and more success, particularly when ERP is implemented for the primary time within the firm or when the platform is modified from one ERP solution to another. The firm’s administration should guarantee correct vendor detailing and technological know-how to the corporate’s in-house IT assist employees. Proper use of technology and an efficient information switch, together with correct training ought to be thought about since they’re the events liable for all the project’s success. Considering the advisor to be part of the mission wouldn’t solely help in an easy and unhandled operation, however would additionally reduce the time gap between the premature glitch and the solution.


9. Project administration and Testing 

After evaluation of all obtainable choices, selecting the best-suited after which training the staff, the real facet of implementation is the project implementation itself. According to Panorama Research research, 40% of ERP implementations trigger main operational disruptions after go-live; due to this fact, correct implementation is crucial. The rigidity might backfire since there are a whole lot of time gaps between the processes of selection, analysis and implementation. . There is also a lateral improvisation that ought to be integrated. Simultaneously, the core goal shouldn’t be diluted or modified.   Testing is a vital part of the ERP implementation process, which takes care of system and consumer acceptance testing.


10. Final touch (go live) & ongoing assist

Once the ERP software is properly-checked and implemented, it’s time to go live. It is advisable to pursue one additional performance take a look at, simply as a security precaution. An ERP solution isn’t a one-time event, however quite a continuous process. It is one thing that the corporate has to constantly hold tabs on to keep away from any aberrations or systemic glitches which may have an effect on the ERP software functionality.